"How long will it take?" That's the first question every founder asks. The answer? Anywhere from 4 weeks to 6 months. Let me show you exactly what determines your timeline and how to actually ship faster.
The Short Answer Nobody Wants
Most MVPs take 8-16 weeks from kickoff to launch.
But that number is useless without context. A landing page with email capture? 1 week. A two-sided marketplace with payments? 16+ weeks. They're both "MVPs."
MVP Timeline by Complexity
Simple MVP: 4-8 Weeks
What you're building:
- 1-2 core features
- Basic authentication
- Simple database
- Clean but minimal UI
- Web-only
Examples:
- Landing page + waitlist
- Simple directory or listing site
- Basic CRUD tool
- Content platform
Week-by-week breakdown:
- Week 1: Planning, wireframes, database design
- Week 2-3: Design + setup infrastructure
- Week 4-6: Core development
- Week 7: Testing + bug fixes
- Week 8: Deploy + polish
Standard MVP: 8-14 Weeks
What you're building:
- 3-5 interconnected features
- User accounts + auth
- Payment integration
- Email notifications
- Basic admin functions
- Polished UI
Examples:
- SaaS tool with subscriptions
- Booking/scheduling platform
- E-commerce MVP
- Social/community platform (basic)
Week-by-week breakdown:
- Week 1-2: Discovery, planning, user flows, database design
- Week 3-4: UI/UX design, design system
- Week 5-10: Core development (frontend + backend)
- Week 11-12: Integration (payments, emails, etc.)
- Week 13: Testing + bug fixes
- Week 14: Deploy, monitoring setup, launch
Complex MVP: 14-24 Weeks
What you're building:
- Multi-sided platform
- Real-time features
- Complex permissions
- Multiple integrations
- Advanced workflows
- Mobile apps
Examples:
- Marketplace with payments + messaging
- Healthcare/fintech with compliance
- On-demand services (Uber-like)
- AI-powered platform
Month-by-month breakdown:
- Month 1: Planning, architecture, compliance review, design
- Month 2-4: Core platform development
- Month 5: Integrations + advanced features
- Month 6: Testing, compliance, launch prep
💡 Reality Check
If someone quotes you 4 weeks for a "complex marketplace," they're either lying or don't understand what you're building. A proper two-sided marketplace MVP takes 12-16 weeks minimum.
What Actually Determines Timeline
1. Number of Features (Obviously)
Each real feature = 1-2 weeks of work.
What counts as "one feature":
- User authentication (email + password + reset): 1 week
- Payment processing (Stripe integration): 1-2 weeks
- Messaging system: 2-3 weeks
- Search with filters: 1-2 weeks
- File uploads + storage: 1 week
- Email notifications: 1 week
Do the math: 6 features = 6-12 weeks of dev time alone.
2. Design Complexity
Template-based design: 1-2 weeks
Custom UI with design system: 3-4 weeks
Highly polished, branded experience: 4-6 weeks
You can't rush good design. Period.
3. Integration Requirements
Each third-party integration adds time:
- Simple API (Stripe, SendGrid): 3-5 days
- OAuth (Google, Facebook login): 5-7 days
- Complex integration (Salesforce, ERP systems): 2-3 weeks
- Custom AI/ML models: 3-6 weeks
4. Platform Choice
- Web only: Baseline timeline
- Responsive web (mobile-friendly): +20% time
- Progressive Web App (PWA): +30% time
- Native iOS OR Android: +100% time
- Both iOS AND Android: +150-200% time
5. Compliance & Regulations
- Standard web app: Baseline
- GDPR compliance: +1-2 weeks
- HIPAA (healthcare): +3-4 weeks
- Financial regulations: +4-6 weeks
- Multi-region compliance: +6-8 weeks
6. Team Experience
This is the one nobody talks about:
- Solo junior developer: 3-4x baseline time
- Solo senior developer: 1.5-2x baseline time
- Small experienced team: Baseline time
- Large agency: 1.5-2x baseline (overhead, processes)
One experienced developer will beat three junior developers every time.
How to Actually Speed Up Your Timeline
1. Cut Features Ruthlessly
Every feature you remove = 1-2 weeks saved.
Ask for each feature: "If we launch without this, will anyone care?"
Features you probably don't need in v1:
- Social login (email is fine)
- Push notifications (email works)
- In-app messaging (use email)
- Advanced search (basic is enough)
- User profiles with photos (later)
- Dark mode (seriously, nobody cares yet)
Time saved: 4-8 weeks
2. Use Modern, Productive Tech Stacks
The right tech stack can cut development time by 40%.
Fast stack:
- Next.js (React framework)
- Supabase or Firebase (BaaS)
- Tailwind CSS (utility-first)
- Vercel (deployment)
- Stripe (payments)
Slow stack:
- Custom backend from scratch
- Manual database setup
- Custom CSS
- Complex deployment pipeline
- Custom payment system
Time saved: 3-6 weeks
3. Start Web-Only
Building native mobile apps doubles or triples your timeline.
Instead: Build responsive web first. Add mobile apps in v2 if needed.
Time saved: 8-16 weeks
4. Use Templates & UI Kits
Don't design every component from scratch.
Good UI kits/templates:
- Tailwind UI ($300)
- Shadcn UI (free)
- Next.js templates (free/paid)
Time saved: 2-4 weeks
5. Parallel Work Streams
Don't wait for design to be 100% done before starting development.
Smart approach:
- Week 1-2: Plan + design core screens
- Week 3: Backend starts while design continues
- Week 4: Frontend starts with completed designs
- Overlap continues throughout
Time saved: 2-3 weeks
6. Make Decisions Fast
Every day of indecision = 1 day of delay.
Be decisive about:
- Design approvals (24-48 hours max)
- Feature changes (document and decide immediately)
- Tech choices (trust your developers)
- Feedback (clear, specific, fast)
Time saved: 1-3 weeks
Timeline Killers (What Slows You Down)
1. Scope Creep
The problem: "While you're at it, can we add..."
Impact: +1-2 weeks per "small addition"
Solution: Lock scope. Keep a "Phase 2" list.
2. Design Revisions
The problem: Changing designs after development has started
Impact: +1-2 weeks per major revision
Solution: Approve designs properly upfront. Use prototypes.
3. Integration Problems
The problem: Third-party APIs don't work as expected
Impact: +3-10 days per problematic integration
Solution: Test integrations early. Have backup options.
4. Unclear Requirements
The problem: "I'll know it when I see it"
Impact: +2-4 weeks of back-and-forth
Solution: Write clear requirements. Use examples.
5. Team Availability
The problem: Developer juggling multiple projects
Impact: 2-3x longer timeline
Solution: Ensure dedicated time or adjust expectations.
Real Timeline Examples
Example 1: Simple SaaS Tool
Product: Email signature generator
Features: Drag-and-drop builder, templates, export HTML, Stripe billing
Quoted: 8 weeks
Actual: 7 weeks
Why on time: Clear scope, no major changes, experienced developer
Example 2: Marketplace MVP
Product: Local services booking platform
Features: Provider profiles, bookings, messaging, payments, reviews
Quoted: 14 weeks
Actual: 18 weeks
Why delayed: Stripe Connect complexity, design revisions, added "quick features"
Example 3: AI Content Tool
Product: AI writing assistant
Features: OpenAI integration, editor, credits system, subscriptions
Quoted: 10 weeks
Actual: 12 weeks
Why delayed: AI prompt engineering took longer, added usage tracking mid-project
Timeline by Industry
| Industry | Typical Timeline | Why It Takes That Long |
|---|---|---|
| SaaS Tool | 8-12 weeks | Standard features, subscription billing |
| E-Commerce | 10-14 weeks | Inventory, checkout flow, payment processing |
| Marketplace | 14-18 weeks | Two-sided platform, complex payments |
| Social Platform | 12-16 weeks | Real-time features, content moderation |
| Healthcare | 16-24 weeks | HIPAA compliance, legal review |
| Fintech | 18-28 weeks | Financial regulations, security, KYC |
| On-Demand | 16-20 weeks | Mobile apps, real-time matching, GPS |
Setting Realistic Expectations
Red Flags in Timeline Estimates
- "We can do it in 2 weeks" → For anything beyond a landing page, this is unrealistic
- "Timeline TBD" → They don't understand your requirements
- No breakdown provided → They're guessing
- Way faster than other quotes → They're underestimating
Good Signs in Timeline Estimates
- Week-by-week or phase breakdown
- Buffer time included
- Milestones defined
- Dependencies identified
- Assumptions stated clearly
The Bottom Line
Most MVPs: 8-16 weeks
Fast track (bare minimum): 4-8 weeks
Complex/regulated: 16-24 weeks
The question isn't "how fast can we build this?" It's "how fast can we build something that actually works and people will pay for?"
Speed matters. But shipping broken garbage in 4 weeks doesn't help anyone.
Ship the right MVP at the right pace. Then iterate fast based on real feedback.
💡 Pro Tip
Want an accurate timeline for YOUR specific MVP? Use our calculator to get a detailed breakdown with realistic timelines based on your requirements.
Ready to Build Your MVP?
Get your personalized cost breakdown with our free calculator, or book a call to discuss our flexible monthly plan.